As shown below, Georgia Power allocated an amount equal to ~$608M of net proceeds to eligible social spend (77%), while the balance of the net proceeds (~$179M, or 23%) was allocated to eligible green spend.

GPC Sustainability Bond Net Proceeds Allocation: $787M

$0 $75 $150 $225 $300 $375 $450 $525 $600 $675 $750 $800
Green: $179M
(23%)
Social: $608M
(77%)
Renewable PPA:
$140M (18%)
Renewable Capex:
$39M (5%)
Diverse Supplier Spend:
$486M (62%)
Small Business
Supplier Spend:
$64M (9%)
Solar PPA:
$105M (4%)
Wind PPA:
$35M (4%)
Robins: $10M (1%)
Ft Valley: $14M (2%)
Ft Gordon: $2M (<1%)
Mossy Branch: $14M (2%)
Minority-Owned:
$109M (14%)
Woman-Owned
$370M (47%)
Veteran-Owned:
$7M (<1%)
Small Business Supplier Spend:
$64M (9%)
Note: totals may not foot due to rounding

Georgia Power allocated an amount equal to the net proceeds to various renewable energy projects—such as self-owned solar facilities and renewable PPAs—as well as to a number of diversity-owned and small-business enterprises. As shown below, the environmental and social benefits from this sustainability bond underscore Georgia Power’s commitment to being a Citizen Wherever We Serve.

Georgia Power Company 2022B Sustainability Bond Impact Summary1

Issuer Series2 Category Number of Suppliers Type /
Designation
Net Proceeds
Allocated ($M)
Project In-Service Date Fact Sheet Capacity (MW) Electricity
Generated (GWh)1
Total CO2 Offset
(mt)3
Home Power
Equivalent4
Renewable Energy $10 Robins Air Force Base Apr-2021 Click Here 128 962 672,807 90,623
Owned Solar $14 Fort Valley State Jan-2022 Click Here 10.7 64 44,365 6,023
$2 Fort Gordon Oct-2016 Click Here 30 156 108,866 14,709
Owned BESS5 $14 Mossy Branch Oct-2024 Click Here 65 - - -
Solar PPA $105 Various (GA)
Wind PPA $35 Various (OK)
Georgia Power 2022B Diverse / Small Business Suppliers 119 Minority-Owned $109
278 Woman-Owned $370
14 Veteran-Owned $7
434 Small Business Enterprise $122

1 Environmental data as of 12/31/2024

2 Click the Series to view the Prospectus Supplement

3 Carbon offset factor = 0.67 based on 2019 methodology per EIA online calculator (EIA's most recent update) https://www.epa.gov/energy/greenhouse-gas-equivalencies-calculator

4 Number of homes factor = 0.0968 based on EIA average 861 kWh per month electricity consumption for 2023 https://www.eia.gov/todayinenergy/detail.php?id=61903

5 Battery Energy Storage System. Included in "Owned Solar" in Management Assertion letter. Designed duration for Mossy Branch is 4 hours

For more information, click here for the Management Assertion and Independent Accountants' Attestation Report.